MPH have just completed the supply, delivery and installation of a new pre-school. The full turnkey package also included site management, portable roads to create segregated access,  foundations, site services, below ground drainage and landscaping.

The modular  facility included a covered external decked play area, internal play areas, wet activity space, office space and toilets. MPH demonstrated the flexibility of modular construction with a bespoke tapered section to create an angled building profile in the Architect’s design.

Working closely with the Architect, stringent planning conditions were also overcome cladding the building externally with brick slips and a locally sourced limestone.

The internal design included new floor coverings to create vibrancy in the teaching space with contrasting colours.

Completion photos and full case study to follow soon.