MPH

/MPH

About MPH

This author has not yet filled in any details.
So far MPH has created 70 blog entries.

The Prefab Four! Grand designs for modular homes

By | November 6th, 2015|Categories: Modular Buildings, Prefabricated Buildings|

Prefabricated modular houses for sale at auction News of an upcoming auction of prefab homes, with prices starting at only 30% of the regular turnkey project cost As a result of insolvency proceedings, four prefab houses, built by modular home manufacturers Schachnerhaus of Austria, are due to be live-auctioned via webcast. Auctioneers Karner & [...]

Comments Off on The Prefab Four! Grand designs for modular homes

Prefabricated modular buildings

By | October 29th, 2015|Categories: Modular Buildings, Offsite Modular Construction|Tags: , |

A construction project in Norway using prefabricated modular buildings caught our eye – and gave us an idea for our next holiday destination! The new adventure and exploration resort by architect Snorre Stinessen on Manshausen Island off the coast of Northern Norway features prefabricated portable cabins, cantilevered over the coastline. Offsite modular [...]

8 classroom two storey teaching block at Furze Platt Senior School

By | March 25th, 2014|Categories: Case Studies|Tags: , , |

When the Mathematics Department at Furze Platt Senior School calculated a shortfall in the ratio of classroom space to student numbers, MPH Building Systems provided the answer with a modular construction two storey teaching block. Entering the equation at an early key stage, MPH project designers drew up plans for a new modular building to [...]

Comments Off on 8 classroom two storey teaching block at Furze Platt Senior School

Latest two storey modular building

By | July 19th, 2013|Categories: Uncategorized|

At 180.0 square metres, our latest stock two storey modular building comprises 10 no. 3.000 x 6.000m bays. Arranged in a 3 on 7 configuration (seven bays at ground floor level, three bays at first floor), the overall building footprint measures 21.000 x 6.000m. For sites bound by confined space or restricted access, the flexibility [...]

Comments Off on Latest two storey modular building

CHAS Principal Contractor status for MPH

By | July 11th, 2013|Categories: Company News|

Ahead of a busy summer of modular build projects, MPH Building Systems have secured Principal Contractor status on the CHAS (Contractors Health and Safety Assessment Scheme) database. Established as the leading health and safety pre-qualification assessment scheme in the UK, CHAS is a national database that serves to complete the initial application process for buyers. [...]

Comments Off on CHAS Principal Contractor status for MPH